Equipment
- 4 x DPPG-HK500
Result
Within 24 hours after the initial site inspection, four HK500 pumps were operating at full capacity. With a total capacity of 18,000 m³ per hour the temporary installation completely took over the function of the defective pumping station.
As a result, the center of Oldenburg remained dry despite the extreme weather conditions.
Particularities
This project demonstrates Van Heck's strength: rapid response when every minute counts. From the first inspection to a fully operational installation, everything was completed in less than one day. Thanks to close cooperation between project management, the workshop, and logistics, it was possible to scale up immediately and the city's water safety remained guaranteed.