Smart siphon setup with vacuum retention
On the inflow side of the weir, the waterway was dammed across its entire width with a sheet pile. Behind it, a second, higher sheet pile was installed. Between these two sheet piles, a closed inflow basin was created: an essential component to maintain the siphon's waterlock.
The siphon installation was placed in this basin, with the end discharging into a container at the bottom. In this way, the vacuum in the siphon remained intact and the water could be discharged in a controlled manner without using active pump energy.







